Travancore Devaswom Board » Project Summary

Project Summary

Work Code Projects Estimated Cost(In Lakhs)

Redevelopment of Pampa Area

SMP/P/6 Facility Centre – Construction of a pilgrim facility centre at Pamba 200
SMP/P/7 Bus Terminal and Resting Bay 150
SMP/P/5 Exit Bridge- construction of a new exit bridge to serve the new emergency road 400
SMP/P/3 STP – construction of a new sewage treatment plant at Pamba 1000
SMP/P/4 Vehicle Parking facilities – improved/organized parking facilities 150
SMP/P/2 Hospital Complex – construction of a new hospital complex (for all the three streams of medicine) in the place of the existing facilities plus mini-ambulance facility 900
SMP/P/1 Emergency Road – construction of a new service road to facilitate movement of emergency vehicles By ABASS – Addl. road furniture 100

Trekking Routes

SMP/T/3 Rope Way – erection of material ropeway between Pampa and Sannidhanam – to ease cargo movement (for temple needs, commercial needs & construction purposes)- gradually eliminating head load/donkeys and reducing tractor movement 1200
SMP/T/1A Two Queue Complexes – construction along the trekking path to hold the surging crowd and to provide way side facilities (Part under construction)
SMP/T/2 Swami Ayyappan Road – widening to 5m and improvements (pavement/side protection/way side facilities etc.) 12
SMP/T/4 Health kiosks – installation of standard prefabricated modules of kiosks for emergency care – four numbers @ Rs. 3 lakhs/unit 12
SMP/T/5 Water kiosks – installation of ten water kiosks @ Rs. 3 lakhs/unit 30

Nilakkal Base Camp

SMP/N/1 Parking Yards- Reorganization of the vehicle parking facilities with pavement improvement and access roads with drains 2000 + 2000
SMP/N/2 Temples – Redevelopment of the two temples (Siva temple and Devi temple) 150
SMP/N/3 Water Supply Improvements -’OH’ Tank , construction of check dam and laying distribution lines 70+450+20
SMP/N/3 Water kiosks – 10 numbers @Rs. 3 lakhs/unit 30
SMP/N/5 Sabari Homes – construction of pilgrim facilities – Andhra/Karnataka/ TN/Kerala etc. 30X4
SMP/N/6 Hospital – a new fully equipped hospital infrastructure will be developed at Nilakkal – this may function in full scale during November to January and may be downscaled during the remaining months 400
SMP/N/7 Facility Centre – construction of a central facility centre – (for information centre, shoplets/ communication kiosks/food courts/lockers/etc.) 300
SMP/N/8 Construction of Electrical Sub Station (through KSEB) 200
SMP/N/9 Bus Shelter and Resting Bays – Construction of bus terminals (for long distance buses and for shuttle services separately) at Nilakkal 200

Sannidhanam Area

SMP/S/2 Valia Nadapandal – Reconstruction – adding one more floor and redevelopment with better facilities 2600
SMP/S/3 Prasadam Complex – Construction of a new (modern) Appam – Aravana Complex with improved machinery 1600+ 400
SMP/S/4 Food Court – construction of a new food court – grouping all restaurants & eating facilities – to provide hygienic environment 400
SMP/S/5 STPs – Construction of new sewage treatment plant and improvements to the existing small and big STPs 2000
SMP/S/6 Kunnar Dam – Improvements to the catchment of area and intake works at the mini dam – and construction of filtering & storage tanks and laying pipes – to augment water supply to Sannidhanam 1256
SMP/S/1A Sarana Sethu – Additional facilities to the new exit road and provision of road side facilities 150
SMP/S/7 Health kiosks – installation of three health kiosks (standard prefabricated modules) for emergency care at Sannidhanam (03×3) = 09
SMP/S/8 Bio mechanical compost plants – installation of three bio mechanical compost plants at different locations at Sannidhanam (08×3) =24
SMP/S/9 Accommodation Controller – Computerised modern systems in the improved centralised accommodation controller’s office 40
SMP/S/10 Dormitory Halls – improved ‘viri pandals’ – 3 units of interconnected three storeyed buildings – Rs. 250 lakhs x 3 750
SMP/S/11 Annadana Halls – 3 numbers of annadana halls each of 500 sqm area – Rs. 100 lakhs x3 300
SMP/S/12 “Aazhi”- modernization of aazhi (ghee coconut burning pit) 40
SMP/S/13 LPG Storage & Gas line – providing LPG storage tanks at Sannidhanam and at Pamba and laying supply lines 150